×
Menu
Index

Create a Labor Category

 
The following steps walk a user, with write access to the module and architecture, through creating a new resource loading in LAM. This process also applies to a data set.
 
A labor category with rates must exist before a resource loading can be assigned to a project.

1. With the desired architecture loaded, ensure you are in the Gantt tab of the Content Pane. In the Home tab of the Ribbon Bar, click the Labor Categories button.
 
2. The labor category selection window pops up. Select the Create button.
 
3. A blank Labor Category Information window then pops up.
 
4. Fill out the required asterisk fields.
 
4a. Rates must also be created for Work and Material resource types. Click the plus icon and a blank Rate Information window then pops up.
Fill out the required asterisk fields. Click Apply when you are finished to close the rate information window.
 
4b. Make sure rate dates do not overlap. Click Apply when you are finished to close the labor category information window.
 
5. Your labor category is now available for projects and appears in the resource loading selection window.
© 2019 Exostrategies, Inc.