×
Menu
Index

Resource Information Window

 
The Resource Information window is displayed when the Resources button is selected in the Ribbon Bar. A resource can define an employee, a contracted organization (such as a moving company), or any needed material (for example, hardware or paper).
 
Resource Information Window
 
1

Fields

1. Fields
  •  Name*: text label that names the resource
  •  Description: any additional information necessary
  •  Resource Type*: defines the type of resource; options are Work, Material, and Cost
  •  Availability Start and End dates: define the time frame the resource is available. Dates must be after 1/1/1753 and before 12/31/9999. A warning message pops up (when Apply is clicked) if the dates are outside this range. Users can edit these fields directly or click the button to display a calendar. Click the X icon to clear the date field.
2

Window Buttons

2. Window Buttons
The Clear Changes button resets all fields to the original values; it only available when editing an existing resource. The Apply button saves edits made in the window, and then closes it. The Cancel button reverses edits made in the window, and then closes it.
 
© 2019 Exostrategies, Inc.